Abstract:
Vehicle platooning control is a branch of Cooperative-Intelligent Transport Systems that aims at reducing the risk of rear-end collisions and improving traffic fluidity. Platooning technologies can benefit of advanced and distributed control strategies, such as the Model Predictive Control, suitable to deal with constraints deriving from inter-vehicle distances and communications as well as to provide adaptive behaviour against variations of speed limits, safety distance, environmental and meteorological parameters provided by the Smart Road. Since vehicle platooning is based on inter-vehicle communications, the control strategy needs to be robust with respect to communication delays. This paper performs a real-time and low-cost Hardware-In-the-Loop testbed based on Raspberry Pi boards that emulate a vehicle platoon managed by a Distributed Model Predictive Control strategy. Results showed a good robustness of the proposed control strategy with respect to communication delays, considering a variable transmission delay in the range [100, 400] ms. The obtained results pave the way to real-road tests, considering connected vehicles equipped with IoT Gateways based on Raspberry Pi hardware.
Read the entire paper here on IEEE Xplore.
Authors: Enrico Landolfi, Alessandro Salvi, Alfredo Troiano and Ciro Natale.
Related Posts
15 Aprile 2024
In giro per atelier – 14 scultori contemporanei si raccontano
In Evidenza
Le nuove funzionalità dell'App PORBEC presenti nel volume "In giro per atelier"…
28 Aprile 2025
La People Strategy ed il ruolo delle Risorse Umane nel confronto multigenerazionale in azienda
The Turkish automotive industry is a key economic driver, producing 1.4M…
31 Marzo 2025
Smart roads e veicoli connessi: il progetto C-Mobility per incroci urbani più sicuri ed efficienti
The Turkish automotive industry is a key economic driver, producing 1.4M…
14 Ottobre 2024
Latest Situation in the Turkish Automotive Industry
The Turkish automotive industry is a key economic driver, producing 1.4M…